Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Marmottes II

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Alpe d'Huez 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Marmottes II 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 2000 
Commissioning date 2000 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2300 m
Height of middle station(s) ?? m
Height of mountain station 2753 m
Vertical rise 453 m
Route distance 1832 m
Horizontal length ?? m
Average incline 31 %
Largest incline 61 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,0 m
Trackwidth line 5,7 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1650 Pers/h
Travel time 5,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 496 kW
Drive power (Operation) 345 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type Omega T 
Cab manufacturer Sigma 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 60 Stk
Cab distance 58,91 m
Cab interval 11,8 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/04/24
PHOTOS: ??

Lift-Statistics
12236 visit(s) since 12/06/04
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 4195
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/4195/datas.htm