Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD Tappenalmbahn

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Mayrhofen 
resort Zillertaler Superskipass 
Region Tyrol 
Country   
Name of lift Tappenalmbahn 
Type 8-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date 2003 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1624 m
Height of mountain station 1772 m
Vertical rise 148 m
Route distance 614 m
Horizontal length 590,3 m
Average incline 25,1 %
Largest incline 71,38 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 2,6 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 383 kW
Drive power (Operation) 195 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 8E98 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 40 Stk
Cab distance 36 m
Cab interval 9 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/05/23
PHOTOS: ??

Lift-Statistics
29261 visit(s) since 02/07/03
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 423
Place-ID: 22

https://www.seilbahntechnik.net/en/lifts/423/datas.htm