Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Zehnerkarbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle station

General information  
Place Obertauern
resort Lungo
Region Salzburg
Country AT Austria, Österreich
Name of lift Zehnerkarbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date 2003

geometric data  
Height of valley station 1670 m
Height of middle station(s) 2056 m
Height of mountain station 2192 m
Vertical rise 522 m
Route distance 1707 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A108
Cab manufacturer CWA
Cab model OMEGA III-8 LWI
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 66 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 13/10/18 18:13:32
PHOTOS: 24/09/06 23:13:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
18573 visit(s) since 10/02/03
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 430
Place-ID: 81

https://www.seilbahntechnik.net/en/lifts/430/datas.htm