Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Bleis

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Tonalepass / Passo Tonale 
resort ?? 
Region Lombardia 
Country   
Name of lift Bleis 
Type 4-CLD/B 
Lift manufacturer Agamatic 
Year of construction 1990/93 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2088 m
Height of middle station(s) ?? m
Height of mountain station 2525 m
Vertical rise 437 m
Route distance 1774 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 23 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 6 min
Driving speed line ?? m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A104 
Cab manufacturer Doppelmayr 
Cab model 4E95/B 
Bubble colour ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 102 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Redaelli 
Length of haul rope 3800 m
Total weight of haul rope 29,4 t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/02/24
PHOTOS: ??

Lift-Statistics
8727 visit(s) since 27/11/04
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 4346
Place-ID: 1625

https://www.seilbahntechnik.net/en/lifts/4346/datas.htm