Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Bergbahn


valley station
valley station

valley station
valley station

cabin
cabin


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Nesselbahn.

General information  
Place Meransen / Maranza
resort
Dolomiti Superski

Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Bergbahn 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 1389,4 m
Height of middle station(s) ?? m
Height of mountain station 1629,40 m
Vertical rise 240 m
Route distance 1571,22 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4,4 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 600 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 108 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 09/11/15 21:38:28
PHOTOS: 08/12/07 22:08:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
7542 visit(s) since 30/05/04
Last visit 21/10/19

LIFT-WORLD IDs
Lift-ID: 4379
Place-ID: 1473

https://www.seilbahntechnik.net/en/lifts/4379/datas.htm