Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Chardonnet

Driving station
Driving station

Valley Station
Valley Station

Line
Line

General information  
Place La Rosière 
resort Espace San Bernardo 
Region Rhône-Alpes 
Country   
Name of lift Chardonnet 
Type 3-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1984 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2231 m
Height of middle station(s) ?? m
Height of mountain station 2393 m
Vertical rise 162 m
Route distance 563 m
Horizontal length ?? m
Average incline 28 %
Largest incline 54 %
Number of pillars 8 Stk
Greatest spanwidth 113 m
Max ground clearance 18 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 4,08 min
Driving speed line 2,3 m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system SEIREL 
Power control system SEIREL 
Number of drive ?? Stk
Drive power (Start) 110 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 78 Stk
Cab distance 14,26 m
Cab interval 6,2 s


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 32 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/06/23
PHOTOS: ??

Lift-Statistics
5592 visit(s) since 12/11/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 4443
Place-ID: 1066

https://www.seilbahntechnik.net/en/lifts/4443/datas.htm