Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Hohe Salve


Line
Line

Entering the Mountain Station
Entering the Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Soell
resort SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hohe Salve 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date ??

geometric data  
Height of valley station 1155 m
Height of mountain station 1825 m
Vertical rise 670 m
Route distance 1836 m
Horizontal length ?? m
Average incline 39,50 %
Largest incline 74,00 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 6,12 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Carvatech
Cab model ULTRA 8 S
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 47 Stk
Cab distance 90 m
Cab interval 18 s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 9 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) 42 




This information are for members only visible!



Updates
Datas: 03/05/15 21:20:58
PHOTOS: 24/04/04 22:28:20

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14007 visit(s) since 01/12/02
Last visit 23/08/19

LIFT-WORLD IDs
Lift-ID: 450
Place-ID: 80

https://www.seilbahntechnik.net/en/lifts/450/datas.htm