Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Sommerberg


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Hintertux
resort Hintertuxer Gletscher
White 5
Zillertaler Superskipass
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Sommerberg 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date 2000

geometric data  
Height of valley station 1597 m
Height of mountain station 2032 m
Vertical rise 435 m
Route distance 1434 m
Horizontal length 1322 m
Average incline 39,80 %
Largest incline 79,00 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 670 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Swoboda
Cab model ULTRA 8 S
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 57 Stk
Cab distance 60 m
Cab interval 12 s
Garage type underground
Garage place mountain station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 24/08/17 16:53:52
PHOTOS: 19/11/05 15:10:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
16469 visit(s) since 03/12/02
Last visit 17/08/19

LIFT-WORLD IDs
Lift-ID: 451
Place-ID: 20

https://www.seilbahntechnik.net/en/lifts/451/datas.htm