Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Horbergbahn


Valley station
Valley station

Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Mayrhofen
resort Ski Zillertal 3000
Zillertaler Superskipass
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Horbergbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date 2000

geometric data  
Height of valley station 620 m
Height of mountain station 1650 m
Vertical rise 1030 m
Route distance 3837 m
Horizontal length ?? m
Average incline 28,10 %
Largest incline 72,00 %
Number of pillars 24 Stk
Greatest spanwidth ?? m
Max ground clearance 50 m
Trackwidth drive 5,5 m
Trackwidth line 5,5 m
Trackwidth return 5,5 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 10,7 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope 7670 m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 4 Stk
Drive power (Start) 1476 kW
Drive power (Operation) 900 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA III-8 XL
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 126 Stk
Cab distance 66,5 m
Cab interval 11,1 s
Garage type ground floor
Garage place valley and mountain
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 06/09/18 07:29:00
PHOTOS: 25/11/05 20:49:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
30094 visit(s) since 26/01/03
Last visit 26/08/19

LIFT-WORLD IDs
Lift-ID: 452
Place-ID: 22

https://www.seilbahntechnik.net/en/lifts/452/datas.htm