Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Horbergbahn

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Mayrhofen 
resort Zillertaler Superskipass 
Region Tyrol 
Country   
Name of lift Horbergbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date 12 / 2000 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Has an additional transport gondola, which is never used.

geometric data  
Height of valley station 620 m
Height of mountain station 1650 m
Vertical rise 1030 m
Route distance 3837 m
Horizontal length ?? m
Average incline 28,10 %
Largest incline 72,00 %
Number of pillars 24 Stk
Greatest spanwidth ?? m
Max ground clearance 50 m
Trackwidth drive 5,5 m
Trackwidth line 5,5 m
Trackwidth return 5,5 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 10,7 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 4 Stk
Drive power (Start) 1476 kW
Drive power (Operation) 900 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 XL 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 126 Stk
Cab distance 66,5 m
Cab interval 11,1 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope 7670 m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 6 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/02/24
PHOTOS: ??

Lift-Statistics
52408 visit(s) since 26/01/03
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 452
Place-ID: 22

https://www.seilbahntechnik.net/en/lifts/452/datas.htm