Lift-Database » Lifts in the world
8-MGD Gletscherexpress
Valley station
Mountain station
Valley station
General information | |
---|---|
Place | Soelden |
resort | ?? |
Region | Tyrol |
Country | |
Name of lift | Gletscherexpress |
Type | 8-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 1998 |
Commissioning date | 1998 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Connection from the winter ski resort to the Rettenbach and Tiefenbach glaciers. Three lattice-towers (59m, 30m and 28m high). Evacuation ropeway with three evacuation trolleys. Bottom station length: UNI XL Top station length: UNI XL Tire conveyors in the contour are powered by electric motors. Sheave types 403 (combo) and 501 (support). Motor: ELIN EST 280 LK Gearbox: Lohmann GPW 245 S 66 Service brake: 1x Type D Safety brake: 1x 50 kN Emergency drive: Cummins 6 BTA 5.9 (177 BHP) Haul rope construction: 6x36 Warrington Seale (Left lang lay sS) Automatic garage. |
geometric data | |
---|---|
Height of valley station | 2672 m |
Height of mountain station | 2756 m |
Vertical rise | 84 m |
Route distance | 1593,5 m |
Horizontal length | 1590,8 m |
Average incline | 5,30 % |
Largest incline | 19,80 % |
Number of pillars | 7 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 5,50 m |
Trackwidth line | 5,50 m |
Trackwidth return | 5,50 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2400 Pers/h |
Travel time | 4,5 min |
Driving speed line | 6,0 m/s |
Driving speed station | 0,3 m/s |
electrical data | |
---|---|
Electrical control | Elin |
Remote control and telemonitoring system | ?? |
Power control system | Elin |
Number of drive | 1 Stk |
Drive power (Start) | 373 kW |
Drive power (Operation) | 292 kW |
Brake power | -112 kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | DT 108 |
Cab manufacturer | CWA |
Cab model | OMEGA III-8 |
Seating | carpet |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 8 |
Number of cabs | 54 Stk |
Cab distance | 72 m |
Cab interval | 12 s |
Garage type | underground |
Garage place | valley station |
Garage direction | forward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | 3257 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 46 mm |
Nominal strength of haul rope | 2060 N/mm² |
Breaking strength of rope | 1792 kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 4,5 months |
Seasontime | ❄ winter |
Evacuation ropeway | yes |
Integrated rescue system | no |
Rope position control | no |
Asset number (Trail map) | D53 |
Updates
Datas: 08/04/22
PHOTOS: ??
Lift-Statistics
25805 visit(s) since 20/11/02
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 46
Place-ID: 1
https://www.seilbahntechnik.net/en/lifts/46/datas.htm
Datas: 08/04/22
PHOTOS: ??
Lift-Statistics
25805 visit(s) since 20/11/02
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 46
Place-ID: 1
https://www.seilbahntechnik.net/en/lifts/46/datas.htm