Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Gletscherexpress


Valley station
Valley station

Mountain station
Mountain station

Valley station
Valley station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Soelden
resort White 5
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Gletscherexpress 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 1998

geometric data  
Height of valley station 2672 m
Height of mountain station 2756 m
Vertical rise 84 m
Route distance 1593 m
Horizontal length ?? m
Average incline 5,30 %
Largest incline 19,80 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system Elin 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA III-8
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 54 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime winter
Evacuation ropeway yes
Integrated rescue system no
Rope position control no
Asset number (Trail map) D53 




This information are for members only visible!



Updates
Datas: 02/01/16 11:41:35
PHOTOS: 09/08/07 10:32:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14507 visit(s) since 20/11/02
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 46
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/46/datas.htm