Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Sandling Jet








Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Altaussee
resort Loser
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Sandling Jet 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2004 
Commissioning date ??

geometric data  
Height of valley station 858 m
Height of middle station(s) 1085 m
Height of mountain station 1212 m
Vertical rise 354 m
Route distance 1352 m
Horizontal length 1267 m
Average incline 28,0 %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1954 Pers/h
Travel time 4,48 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 560 kW
Drive power (Operation) 507 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour neutral
Seating leather
Seat heater no
Persons per cab
Number of cabs 56 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 27/11/15 18:19:35
PHOTOS: 20/02/10 12:03:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8350 visit(s) since 03/12/04
Last visit 18/10/19

LIFT-WORLD IDs
Lift-ID: 4634
Place-ID: 242

https://www.seilbahntechnik.net/en/lifts/4634/datas.htm