Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Tiefenbachbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Soelden
resort White 5
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Tiefenbachbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date 2000

geometric data  
Height of valley station 2795 m
Height of mountain station 3249 m
Vertical rise 454 m
Route distance 2039 m
Horizontal length ?? m
Average incline 22,80 %
Largest incline 49,50 %
Number of pillars 13 Stk
Greatest spanwidth 600 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 5,66 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 4147 m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulically (fix)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system Elin 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1040 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA III-8
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 78 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) E66 




This information are for members only visible!



Updates
Datas: 21/02/17 21:57:30
PHOTOS: 10/10/03 12:33:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
19029 visit(s) since 20/11/02
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 47
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/47/datas.htm