Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Hornspitz-EXPRESS II


Mountain Station
Mountain Station

Mountain Station
Mountain Station

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Gosau
resort Skiregion Dachstein West
Region Salzburg
Country AT Austria, Österreich
Name of lift Hornspitz-EXPRESS II 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2004 
Commissioning date ??

geometric data  
Height of valley station 1136 m
Height of mountain station 1415 m
Vertical rise 279 m
Route distance 1393 m
Horizontal length 1365 m
Average incline 20,4 %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2234 Pers/h
Travel time 4,78 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 430 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Doppelmayr
Cab model 6E98/B
Bubble colour
Seating leather
Seat heater no
Persons per cab
Number of cabs 63 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 33 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/01/12 18:12:00
PHOTOS: 11/04/19 21:55:45

Lift-Statistics
11443 visit(s) since 16/07/04
Last visit 02/12/21

LIFT-WORLD IDs
Lift-ID: 4719
Place-ID: 347

https://www.seilbahntechnik.net/en/lifts/4719/datas.htm