Lift-Database » Lifts in the world
4-CLF Hochalpbahn
Valley station
Line
Mountain station
General information | |
---|---|
Place | Pfronten |
resort | ?? |
Region | Bavaria |
Country | |
Name of lift | Hochalpbahn |
Type | 4-CLF |
Lift manufacturer | Leitner |
Year of construction | 2004 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1494 m |
Height of middle station(s) | ?? m |
Height of mountain station | 1677 m |
Vertical rise | 183 m |
Route distance | 784 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 10 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1750 Pers/h |
Travel time | 5,45 min |
Driving speed line | 2,4 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 140 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Leitner |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 80 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 4 months |
Seasontime | ?? |
Loading carpet | yes |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 23/11/19
PHOTOS: ??
Lift-Statistics
9019 visit(s) since 28/07/04
Last visit 14/10/24
LIFT-WORLD IDs
Lift-ID: 4811
Place-ID: 1918
https://www.seilbahntechnik.net/en/lifts/4811/datas.htm
Datas: 23/11/19
PHOTOS: ??
Lift-Statistics
9019 visit(s) since 28/07/04
Last visit 14/10/24
LIFT-WORLD IDs
Lift-ID: 4811
Place-ID: 1918
https://www.seilbahntechnik.net/en/lifts/4811/datas.htm