Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  50-AT Wendelsteinbahn







General information  
Place Bayrischzell 
resort Wendelstein 
Region Bavaria 
Country   
Name of lift Wendelsteinbahn 
Type 50-AT 
Lift manufacturer PHB 
Year of construction 1969 
Commissioning date 20/02/70 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 792 m
Height of mountain station 1724 m
Vertical rise 932 m
Route distance 2953 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 1 Stk
Greatest spanwidth ?? m
Max ground clearance 170 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 450 Pers/h
Travel time 6,5 min
Driving speed line 10,0 m/s
Speed on towers ?? m/s

electrical data  
Electrical control AEG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 315 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Swoboda 
Cab model ?? 
Heater ?? 
Aircon ?? 
Persons per cab 50 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer Felten & Guilleaume 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter ?? mm
Traction rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ?? 
Tensionstation tractionrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 18 months
Seasontime ❄ ☀ all-season 
xxxx hier text hin xxxx ?? 
Moving platform ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/08/18
PHOTOS: ??

Lift-Statistics
17348 visit(s) since 20/02/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 485
Place-ID: 159

https://www.seilbahntechnik.net/en/lifts/485/datas.htm