Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Elferbahn





Mountain Station
Mountain Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Neustift im Stubaital
resort Elfer
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Elferbahn 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2004 
Commissioning date ??

geometric data  
Height of valley station 981 m
Height of middle station(s) ?? m
Height of mountain station 1793 m
Vertical rise 812 m
Route distance 1804 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 5,0 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 577 kW
Drive power (Operation) 541 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model ??
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 29 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 2 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 09/03/06 21:41:00
PHOTOS: 31/10/07 20:36:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12393 visit(s) since 01/08/04
Last visit 22/11/19

LIFT-WORLD IDs
Lift-ID: 4893
Place-ID: 87

https://www.seilbahntechnik.net/en/lifts/4893/datas.htm