Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B FIS












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place St. Moritz
resort
Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift FIS 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2002 
Commissioning date ??

geometric data  
Height of valley station 2436,10 m
Height of middle station(s) ?? m
Height of mountain station 2661,25 m
Vertical rise 225,15 m
Route distance 898,58 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 3,08 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 3,0 m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 542 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour
Seating leather
Seat heater no
Persons per cab
Number of cabs 55 Stk
Cab distance 36,0 m
Cab interval 7,2 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance 90°
Situation of exit 90°
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 13/04/09 18:35:00
PHOTOS: 08/02/10 18:27:00

Lift-Statistics
6782 visit(s) since 10/01/05
Last visit 25/09/21

LIFT-WORLD IDs
Lift-ID: 510
Place-ID: 1726

https://www.seilbahntechnik.net/en/lifts/510/datas.htm