Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Bärgji-Hannigalp

Valley Station
Valley Station

Line
Line

Line
Line

General information  
Place Graechen 
resort ?? 
Region Valais 
Country   
Name of lift Bärgji-Hannigalp 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1996 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1655 m
Height of middle station(s) ?? m
Height of mountain station 2173 m
Vertical rise 518 m
Route distance 1609 m
Horizontal length ?? m
Average incline 34,3 %
Largest incline 69,7 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 811 kW
Drive power (Operation) 606 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 122 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance ?? 
Situation of exit parallel 
Loading carpet ?? 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/09/23
PHOTOS: ??

Lift-Statistics
9750 visit(s) since 20/02/05
Last visit 05/12/24

LIFT-WORLD IDs
Lift-ID: 5181
Place-ID: 129

https://www.seilbahntechnik.net/en/lifts/5181/datas.htm