Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Tovets


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Courchevel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Tovets 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2004 
Commissioning date 2004

geometric data  
Height of valley station 1479 m
Height of mountain station 1749 m
Vertical rise 270 m
Route distance 1006 m
Horizontal length ?? m
Average incline ?? %
Largest incline 53 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,7 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time 3,66 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 424 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type Omega T
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 55 Stk
Cab distance 40 m
Cab interval 8,0 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 07/02/17 22:21:13
PHOTOS: 10/09/05 16:27:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6883 visit(s) since 01/01/05
Last visit 15/09/19

LIFT-WORLD IDs
Lift-ID: 5344
Place-ID: 1009

https://www.seilbahntechnik.net/en/lifts/5344/datas.htm