Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Pian del Crep










General information  
Place Fusine 
resort Dolomiti Superski 
Region Veneto 
Country   
Name of lift Pian del Crep 
Type 12-MGD 
Lift manufacturer Leitner 
Year of construction 1989 
Commissioning date ?? 
Date of closing down 6 avr. 2026 
Date of pull down 2026 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1399 m
Height of middle station(s) ?? m
Height of mountain station 1766 m
Vertical rise 367 m
Route distance 1191 m
Horizontal length 1120,85 m
Average incline 34 %
Largest incline 79,1 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3600 Pers/h
Travel time 3,2 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 1088 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Fibercar 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 12 
Number of cabs 43 Stk
Cab distance 72 m
Cab interval 12 s
Garage type ?? 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Redaelli 
Length of haul rope 2600 m
Total weight of haul rope 25,2 t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28 mars 2026
PHOTOS: ??

Lift-Statistics
18857 visit(s) since 12 févr. 2005
Last visit 2 juin 2026

LIFT-WORLD IDs
Lift-ID: 5515
Place-ID: 1665

https://www.seilbahntechnik.net/en/lifts/5515/datas.htm