Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


15-MGD Gletscherjet II


Line
Line

Mountaion Station
Mountaion Station

Valley station exit
Valley station exit


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Kaprun
resort Kitzsteinhorn
Region Salzburg
Country AT Austria, Österreich
Name of lift Gletscherjet II 
Type 15-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date 2002

geometric data  
Height of valley station 1979 m
Height of mountain station 2453 m
Vertical rise 474 m
Route distance 1460 m
Horizontal length ?? m
Average incline ?? %
Largest incline 55,31 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3600 Pers/h
Travel time 4,1 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 2988 m
Total weight of haul rope 33 t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 920 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 215
Cab manufacturer CWA
Cab model CONUS 15
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab 15 
Number of cabs 42 Stk
Cab distance 90 m
Cab interval 15 s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 13/08/15 20:34:09
PHOTOS: 25/12/06 20:39:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
19400 visit(s) since 23/11/02
Last visit 24/08/19

LIFT-WORLD IDs
Lift-ID: 561
Place-ID: 5

https://www.seilbahntechnik.net/en/lifts/561/datas.htm