Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Bettmeralp - Bettmerhorn












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Bettmeralp
resort Aletsch Arena
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Bettmeralp - Bettmerhorn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date ??

geometric data  
Height of valley station 1991 m
Height of mountain station 2652 m
Vertical rise 662 m
Route distance 2324 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 7,75 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 4704 m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 968 kW
Drive power (Operation) 664 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model X8
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 88 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs 20,000,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period 8 months
Seasontime ??
Evacuation ropeway yes
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/05/20 20:55:57
PHOTOS: 25/03/07 19:48:00

Lift-Statistics
9858 visit(s) since 24/11/02
Last visit 04/06/20

LIFT-WORLD IDs
Lift-ID: 576
Place-ID: 2009

https://www.seilbahntechnik.net/en/lifts/576/datas.htm