Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Plan Cardinal

Valley Station
Valley Station

Valley Station
Valley Station

Line
Line

General information  
Place Val Cenis 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift Plan Cardinal 
Type 2-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 2000 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
it was built by Montaz-Mautino in 1984. it was on another place of the resort, it was called Predrix Blanches and was moved by Skirail in 2000.

geometric data  
Height of valley station 2100 m
Height of middle station(s) ?? m
Height of mountain station 2540 m
Vertical rise 440 m
Route distance 1100 m
Horizontal length 1012 m
Average incline 42 %
Largest incline 66 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 3,4 m
Trackwidth line 3,9 m
Trackwidth return 3,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 7,2 min
Driving speed line 2,5 m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 110 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 136 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 34 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 10 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/04/22
PHOTOS: ??

Lift-Statistics
6868 visit(s) since 10/03/05
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 5764
Place-ID: 1230

https://www.seilbahntechnik.net/en/lifts/5764/datas.htm