Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Pont des Chevres

Line
Line

Mountain Station
Mountain Station

Valley Station
Valley Station

General information  
Place Val Cenis 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift Pont des Chevres 
Type 3-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1980 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1395 m
Height of middle station(s) ?? m
Height of mountain station 1633 m
Vertical rise 238 m
Route distance 1000 m
Horizontal length 983 m
Average incline 24 %
Largest incline 26 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 3,9 m
Trackwidth line 3,9 m
Trackwidth return 3,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1350 Pers/h
Travel time 7,25 min
Driving speed line 2,25 m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 110 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 111 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 33 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/04/22
PHOTOS: ??

Lift-Statistics
6101 visit(s) since 08/04/05
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 5765
Place-ID: 1230

https://www.seilbahntechnik.net/en/lifts/5765/datas.htm