Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Ehrwalder Almbahn



General information  
Place Ehrwald 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Ehrwalder Almbahn 
Type 4-MGD 
Lift manufacturer Girak 
Year of construction 1979 
Commissioning date ?? 
Date of closing down 2001 
Date of pull down 2001 


Infos for handicapped persons
Sorry, no information available.

Characteristics
sold to Iran (Ganjnameh Telekabin)

geometric data  
Height of valley station 1100 m
Height of mountain station 1500 m
Vertical rise 400 m
Route distance 2275 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1000 Pers/h
Travel time 12 min
Driving speed line 3,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control AEG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model GLACIER 4 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 88 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 12 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 31/12/23
PHOTOS: ??

Lift-Statistics
10206 visit(s) since 29/03/05
Last visit 09/11/24

LIFT-WORLD IDs
Lift-ID: 5867
Place-ID: 85

https://www.seilbahntechnik.net/en/lifts/5867/datas.htm