Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


24-FUT Péclet


Line
Line

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
First Ever Funitel lift. Built 1990

General information  
Place Val Thorens
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Péclet 
Type 24-FUT 
Lift manufacturer Creissels 
Year of construction 1990 
Commissioning date 1990

geometric data  
Height of valley station 2239 m
Height of mountain station 2943 m
Vertical rise 704 m
Route distance 3140 m
Horizontal length 3002 m
Average incline 23 %
Largest incline 62 %
Number of pillars 11 Stk
Greatest spanwidth 750 m
Max ground clearance 50 m
Trackwidth drive ?? m
Trackwidth line 7,23 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 7,5 min
Driving speed line 6,6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope 12900 m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) 1444 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Gangloff
Cab model ??
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab 24 
Number of cabs 38 Stk
Cab distance 240 m
Cab interval 36,36 s
Garage type ground floor
Garage place valley station
Garage direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 19/03/17 14:38:15
PHOTOS: 20/05/04 19:48:11

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14860 visit(s) since 07/01/03
Last visit 17/09/19

LIFT-WORLD IDs
Lift-ID: 60
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/60/datas.htm