Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Fulseck I


Valley station
Valley station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Through operation with Fulseck 2.

General information  
Place Dorfgastein
resort Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift Fulseck I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date ??

geometric data  
Height of valley station 873 m
Height of mountain station 1470 m
Vertical rise 597 m
Route distance 1319 m
Horizontal length ?? m
Average incline 50,73 %
Largest incline 78,60 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 659 kW
Drive power (Operation) 597 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 53 Stk
Cab distance ?? m
Cab interval 10,8 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ??
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 11/03/18 21:32:32
PHOTOS: 10/09/06 11:32:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14366 visit(s) since 13/04/03
Last visit 24/08/19

LIFT-WORLD IDs
Lift-ID: 602
Place-ID: 244

https://www.seilbahntechnik.net/en/lifts/602/datas.htm