Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Hörnerbahn


Valley Station
Valley Station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Bolsterlang
resort
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Hörnerbahn 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date ??

geometric data  
Height of valley station 940 m
Height of middle station(s) 1350 m
Height of mountain station 1540 m
Vertical rise 600 m
Route distance 1780 m
Horizontal length ?? m
Average incline 43 %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 (1650) Pers/h
Travel time 6,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Swoboda
Cab model ULTRA 6
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 58 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 24/02/14 20:44:00
PHOTOS: 24/02/09 22:10:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11280 visit(s) since 28/11/02
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 603
Place-ID: 3

https://www.seilbahntechnik.net/en/lifts/603/datas.htm