Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


33-FUT Grand Fond












Infos for handicapped persons
Sorry, no information available.

Characteristics
first Funitel from Poma.

General information  
Place Val Thorens
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Grand Fond 
Type 33-FUT 
Lift manufacturer Poma 
Year of construction 2001 
Commissioning date 2001

geometric data  
Height of valley station 2462 m
Height of mountain station 3004 m
Vertical rise 542 m
Route distance 1986 m
Horizontal length ?? m
Average incline ?? %
Largest incline 49 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 9,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4,0 min
Driving speed line 7,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope 135 t
Haul rope diameter 51 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) 1600 kW
Drive power (Operation) 567 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab 33 
Number of cabs 20 Stk
Cab distance 277,2 m
Cab interval 39,6 s
Garage type station circulation
Garage place in all stations
Garage direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 17/03/17 22:00:22
PHOTOS: 16/09/06 20:37:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
13885 visit(s) since 28/11/02
Last visit 17/09/19

LIFT-WORLD IDs
Lift-ID: 61
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/61/datas.htm