Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Sairon



General information  
Place Morillon 
resort Grand Massif 
Region Rhône-Alpes 
Country   
Name of lift Sairon 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 1986 
Commissioning date 1986 
Date of closing down 04 / 2022 
Date of pull down 04 / 2022 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1078 m
Height of middle station(s) ?? m
Height of mountain station 1711 m
Vertical rise 633 m
Route distance 2851 m
Horizontal length ?? m
Average incline 23 %
Largest incline 67 %
Number of pillars 29 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 9,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system Semer 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 700 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 197 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/07/22
PHOTOS: ??

Lift-Statistics
3817 visit(s) since 24/07/05
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 6346
Place-ID: 1143

https://www.seilbahntechnik.net/en/lifts/6346/datas.htm