Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Logère

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Crest-Voland 
resort Espace Diamant 
Region Rhône-Alpes 
Country   
Name of lift Logère 
Type 4-CLD 
Lift manufacturer Montaz Mautino 
Year of construction 1986 
Commissioning date 1986 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1220 m
Height of middle station(s) ?? m
Height of mountain station 1600 m
Vertical rise 380 m
Route distance 1641 m
Horizontal length ?? m
Average incline 23,3 %
Largest incline 49 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 5,47 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 107 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/12/17
PHOTOS: ??

Lift-Statistics
6822 visit(s) since 03/11/05
Last visit 30/12/24

LIFT-WORLD IDs
Lift-ID: 6382
Place-ID: 1010

https://www.seilbahntechnik.net/en/lifts/6382/datas.htm