Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Doischberg


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Fieberbrunn
resort Skicircus
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Doischberg 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2001 
Commissioning date ??

geometric data  
Height of valley station 838,55 m
Height of mountain station 1187,65 m
Vertical rise 349,1 m
Route distance 1527,92 m
Horizontal length ?? m
Average incline 23,47 %
Largest incline 51,42 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1900 Pers/h
Travel time 5,25 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 3156 m
Total weight of haul rope 29 t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 450 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 54 Stk
Cab distance 65 m
Cab interval 13 s
Garage type emergency rail
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 11/03/18 21:29:00
PHOTOS: 27/08/03 10:20:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
18258 visit(s) since 23/11/02
Last visit 17/09/19

LIFT-WORLD IDs
Lift-ID: 649
Place-ID: 50

https://www.seilbahntechnik.net/en/lifts/649/datas.htm