Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD L `Altiport





Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
First 8-CLD in France.

General information  
Place Meribel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift L `Altiport 
Type 8-CLD 
Lift manufacturer Poma 
Year of construction 2000 
Commissioning date 2000

geometric data  
Height of valley station 1718 m
Height of mountain station 1993 m
Vertical rise 275 m
Route distance 1436 m
Horizontal length 1414 m
Average incline 19 %
Largest incline 44 %
Number of pillars 16 Stk
Greatest spanwidth 168 m
Max ground clearance 22 m
Trackwidth drive ?? m
Trackwidth line 7,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3400 Pers/h
Travel time 4,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 500 kW
Drive power (Operation) 500 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type Omega TL
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 74 Stk
Cab distance 42,35 m
Cab interval 8,5 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 31/12/16 17:50:44
PHOTOS: 20/09/05 20:07:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11175 visit(s) since 23/11/02
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 65
Place-ID: 1130

https://www.seilbahntechnik.net/en/lifts/65/datas.htm