Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Eissee


Valle Station
Valle Station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Innerfragant
resort Moelltaler Gletscher
Region Carinthia, Kärnten
Country AT Austria, Österreich
Name of lift Eissee 
Type 6-MGD 
Lift manufacturer Girak 
Year of construction 1986/01 
Commissioning date ??

geometric data  
Height of valley station 2241 m
Height of mountain station 2797 m
Vertical rise 556 m
Route distance 1765 m
Horizontal length 1642 m
Average incline 33,9 %
Largest incline 99,47 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,9 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 430 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA 6s
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 115 Stk
Cab distance 45 m
Cab interval 9,0 s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 14/03/19 20:11:19
PHOTOS: 08/01/05 15:31:21

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10352 visit(s) since 22/05/03
Last visit 13/10/19

LIFT-WORLD IDs
Lift-ID: 651
Place-ID: 446

https://www.seilbahntechnik.net/en/lifts/651/datas.htm