Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Lauzieres

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Monêtier 
resort Serre Chevalier Vallée 
Region Provence-Alpes-Côte d'Azur 
Country   
Name of lift Lauzieres 
Type 4-CLF 
Lift manufacturer Poma 
Year of construction 1987 
Commissioning date ?? 
Date of closing down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1790 m
Height of middle station(s) ?? m
Height of mountain station 2182 m
Vertical rise 392 m
Route distance 1287 m
Horizontal length ?? m
Average incline 32 %
Largest incline 51 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1510 (1800) Pers/h
Travel time 9,5 min
Driving speed line 2,25 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 250 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 120 (143) Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/10/24
PHOTOS: ??

Lift-Statistics
5108 visit(s) since 13/11/05
Last visit 06/12/24

LIFT-WORLD IDs
Lift-ID: 6599
Place-ID: 1137

https://www.seilbahntechnik.net/en/lifts/6599/datas.htm