Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD BUGA München 2005







General information  
Place Munich 
resort ?? 
Region Bavaria 
Country   
Name of lift BUGA München 2005 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2004 
Commissioning date ?? 
Date of closing down 2005 
Date of pull down ?? 
Second-hand lift. Formerly lift no. 7624 


Infos for handicapped persons
Sorry, no information available.

Characteristics
3-Corner lift

geometric data  
Height of valley station 532 m
Height of middle station(s) ?? m
Height of mountain station 530 m
Vertical rise 2 m
Route distance ?? m
Horizontal length 2920 m
Average incline 0,57 %
Largest incline 22,77 %
Number of pillars 24 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,2 m
Trackwidth line 6,1 m
Trackwidth return 5,2 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2500 Pers/h
Travel time 4,68 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 477 kW
Drive power (Operation) 349 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model ETHOS 8 LWI 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 64 Stk
Cab distance 57,6 m
Cab interval 11,52 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 2962,9 m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Apr 6, 2020
PHOTOS: ??

Lift-Statistics
7736 visit(s) since May 26, 2005
Last visit Aug 1, 2025

LIFT-WORLD IDs
Lift-ID: 6633
Place-ID: 1897

https://www.seilbahntechnik.net/en/lifts/6633/datas.htm