Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Panoramabahn Kitzbüheler Alpen I


Valley station
Valley station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Mittersill
resort Kitzbuehel
Region Salzburg
Country AT Austria, Österreich
Name of lift Panoramabahn Kitzbüheler Alpen I 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ??

geometric data  
Height of valley station 803 m
Height of mountain station 1231 m
Vertical rise 428 m
Route distance 2116,46 m
Horizontal length 2057,36 m
Average incline ?? %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 48 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 12 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 04/08/09 18:23:00
PHOTOS: 12/05/06 17:18:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
16327 visit(s) since 01/06/05
Last visit 24/08/19

LIFT-WORLD IDs
Lift-ID: 6900
Place-ID: 56

https://www.seilbahntechnik.net/en/lifts/6900/datas.htm