Lift-Database » Lifts in the world
2-CLF Eclose
Valley Station
Line
Line
General information | |
---|---|
Place | Alpe d'Huez |
resort | Alpe d'Huez |
Region | Rhône-Alpes |
Country | |
Name of lift | Eclose |
Type | 2-CLF |
Lift manufacturer | Poma |
Year of construction | 1986 |
Commissioning date | 1986 |
Date of closing down | 2018 |
Date of pull down | 2018 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Nothing |
geometric data | |
---|---|
Height of valley station | 1787 m |
Height of middle station(s) | ?? m |
Height of mountain station | 1824 m |
Vertical rise | 37 m |
Route distance | 278 m |
Horizontal length | ?? m |
Average incline | 16 % |
Largest incline | 17 % |
Number of pillars | 4 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1440 Pers/h |
Travel time | 2,5 min |
Driving speed line | 1,8 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | ?? |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 60 Stk |
Cab distance | 9 m |
Cab interval | 5 s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulically (fix) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 05/12/23
PHOTOS: ??
Lift-Statistics
10209 visit(s) since 21/07/05
Last visit 21/12/24
LIFT-WORLD IDs
Lift-ID: 7138
Place-ID: 229
https://www.seilbahntechnik.net/en/lifts/7138/datas.htm
Datas: 05/12/23
PHOTOS: ??
Lift-Statistics
10209 visit(s) since 21/07/05
Last visit 21/12/24
LIFT-WORLD IDs
Lift-ID: 7138
Place-ID: 229
https://www.seilbahntechnik.net/en/lifts/7138/datas.htm