Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Villarais

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Alpe d'Huez 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Villarais 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1997 
Commissioning date 1997 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1560 m
Height of middle station(s) ?? m
Height of mountain station 2103 m
Vertical rise 543 m
Route distance 1890 m
Horizontal length ?? m
Average incline 30 %
Largest incline 72 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 6,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 610 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 120 Stk
Cab distance 33 m
Cab interval 7,33 s
Garage type emergency rail 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/04/24
PHOTOS: ??

Lift-Statistics
12617 visit(s) since 05/07/05
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 7149
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/7149/datas.htm