Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Kronplatz 2000


Mountain station
Mountain station

Valley Station
Valley Station

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Bruneck / Brunico
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Kronplatz 2000 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2000 
Commissioning date ??

geometric data  
Height of valley station 945 m
Height of mountain station 2259 m
Vertical rise 1314 m
Route distance 4060 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 27 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 11,3 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control EEI 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1860 kW
Drive power (Operation) 1560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 103 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 9 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 09/11/15 21:56:05
PHOTOS: 09/08/05 18:23:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
13436 visit(s) since 18/12/02
Last visit 18/10/19

LIFT-WORLD IDs
Lift-ID: 722
Place-ID: 1329

https://www.seilbahntechnik.net/en/lifts/722/datas.htm