Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Ki-West (Kreuzjöchlsee)


Mountain station
Mountain station

Valley station
Valley station

Strecke with mountain station
Strecke with mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Westendorf
resort SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Ki-West (Kreuzjöchlsee) 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ??

geometric data  
Height of valley station 945 m
Height of middle station(s) ?? m
Height of mountain station 1744 m
Vertical rise 799,00 m
Route distance 3056,00 m
Horizontal length ?? m
Average incline 27,76 %
Largest incline 70 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 8 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 6084,00 m
Total weight of haul rope ?? t
Haul rope diameter 53 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA III-8 LWI
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 63 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 08/05/15 18:33:55
PHOTOS: 23/03/06 21:29:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
16660 visit(s) since 26/07/05
Last visit 18/08/19

LIFT-WORLD IDs
Lift-ID: 7379
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/7379/datas.htm