Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Belle Étoile

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Les Deux Alpes 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift Belle Étoile 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 1993 
Commissioning date ?? 
Date of closing down 2023 
Date of pull down 2023 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1650 m
Height of middle station(s) ?? m
Height of mountain station 2163 m
Vertical rise 513 m
Route distance 1409 m
Horizontal length ?? m
Average incline 38 %
Largest incline 69 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time ?? min
Driving speed line 4,3 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/12/23
PHOTOS: ??

Lift-Statistics
5777 visit(s) since 26/08/05
Last visit 23/11/24

LIFT-WORLD IDs
Lift-ID: 7423
Place-ID: 1103

https://www.seilbahntechnik.net/en/lifts/7423/datas.htm