Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Rododendro - Malga Tognolo





Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place San Martino di Castrozza
resort Dolomiti Superski

Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Rododendro - Malga Tognolo 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 2005 
Commissioning date ??

geometric data  
Height of valley station 1922,4 m
Height of middle station(s) ?? m
Height of mountain station 2143,90 m
Vertical rise 221,50 m
Route distance 688,22 m
Horizontal length 639,00 m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,30 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2367 Pers/h
Travel time ?? min
Driving speed line 5,00 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating ??
Seat heater ??
Persons per cab
Number of cabs 50 Stk
Cab distance 30,41 m
Cab interval 6,08 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance ??
Situation of exit ??
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 17/11/15 21:34:06
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
3807 visit(s) since 26/09/05
Last visit 20/10/19

LIFT-WORLD IDs
Lift-ID: 7922
Place-ID: 1575

https://www.seilbahntechnik.net/en/lifts/7922/datas.htm