Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Wiedersbergerhornlift IIb

Valley station
Valley station

Sheave assembly
Sheave assembly

Pillar
Pillar

General information  
Place Alpbach 
resort ?? 
Region Tyrol 
Country   
Name of lift Wiedersbergerhornlift IIb 
Type 1-CLF 
Lift manufacturer Felix Wopfner 
Year of construction 1973 
Commissioning date ?? 
Date of closing down 2012 
Date of pull down 2013 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1358 m
Height of mountain station 1844 m
Vertical rise 486 m
Route distance 1412 m
Horizontal length ?? m
Average incline 36,00 %
Largest incline 42,00 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 850 Pers/h
Travel time 9,5 min
Driving speed line 2,5 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Felix Wopfner 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer St. Egydyer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 31 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/01/24
PHOTOS: ??

Lift-Statistics
19588 visit(s) since 20/07/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 8
Place-ID: 48

https://www.seilbahntechnik.net/en/lifts/8/datas.htm