Lift-Database » Lifts in the world
15-BGD Penkenbahn

Cabin

Pillar 1

General view
General information | |
---|---|
Place | Mayrhofen |
resort | Zillertaler Superskipass |
Region | Tyrol |
Country | ![]() |
Name of lift | Penkenbahn |
Type | 15-BGD |
Lift manufacturer | Waagner Biro |
Year of construction | 1995 |
Commissioning date | Dec 16, 1995 |
Date of closing down | 2015 |
Date of pull down | 2015 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 650 m |
Height of mountain station | 1795 m |
Vertical rise | 1145 m |
Route distance | 2924 m |
Horizontal length | ?? m |
Average incline | 42,50 % |
Largest incline | 74,80 % |
Number of pillars | 3 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 10,5 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2000 Pers/h |
Travel time | 9 min |
Driving speed line | 5,5 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 1150 kW |
Drive power (Operation) | 750 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | BETA VISTA |
Seating | carpet |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 15 |
Number of cabs | 48 Stk |
Cab distance | 148 m |
Cab interval | 26,9 s |
Garage type | ground floor |
Garage place | valley and mountain |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | VA Austria Draht |
Length of carrying rope | ?? m |
Length of traction rope | ?? m |
Total weight of carrying rope | ?? t |
Total weight of traction rope | ?? t |
Carrying rope diameter | ?? mm |
Traction rope diameter | ?? mm |
Nominal strength of carrying rope | ?? N/mm² |
Nominal strength of traction rope | ?? N/mm² |
Breaking strength of carrying rope | ?? kN |
Breaking strength of traction rope | ?? kN |
Number of carrying rope | ?? Stk |
Tensionstation carryingrope | ?? |
Tensionstation tractionrope | ?? |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 10 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | yes |
Integrated rescue system | no |
Rope position control | no |
Asset number (Trail map) | ?? |
Updates
Datas: Jan 20, 2024
PHOTOS: ??
Lift-Statistics
51181 visit(s) since Nov 21, 2002
Last visit Apr 18, 2025
LIFT-WORLD IDs
Lift-ID: 835
Place-ID: 22
https://www.seilbahntechnik.net/en/lifts/835/datas.htm
Datas: Jan 20, 2024
PHOTOS: ??
Lift-Statistics
51181 visit(s) since Nov 21, 2002
Last visit Apr 18, 2025
LIFT-WORLD IDs
Lift-ID: 835
Place-ID: 22
https://www.seilbahntechnik.net/en/lifts/835/datas.htm