Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Plantrey


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Courchevel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Plantrey 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 1983 
Commissioning date 1983
Date of closing down 2011
Date of pull down 2011

geometric data  
Height of valley station 1688 m
Height of mountain station 2188 m
Vertical rise 500 m
Route distance 1735 m
Horizontal length ?? m
Average incline 28 %
Largest incline 43 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2450 Pers/h
Travel time 5,78 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 569 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 124 Stk
Cab distance 25 m
Cab interval 5 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 21/01/17 19:32:05
PHOTOS: 27/12/05 18:34:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4317 visit(s) since 16/11/05
Last visit 17/10/19

LIFT-WORLD IDs
Lift-ID: 8419
Place-ID: 1009

https://www.seilbahntechnik.net/en/lifts/8419/datas.htm