Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Imbergbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Steibis
resort Skiarena Steibis
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Imbergbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2005 
Commissioning date ??

geometric data  
Height of valley station 913 m
Height of mountain station 1217 m
Vertical rise 304 m
Route distance 1230 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2000) Pers/h
Travel time 5,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 2362 m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA III-8 LWI
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 34 (42) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 23/08/10 21:08:00
PHOTOS: 31/10/06 18:55:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9898 visit(s) since 08/11/05
Last visit 23/08/19

LIFT-WORLD IDs
Lift-ID: 8445
Place-ID: 290

https://www.seilbahntechnik.net/en/lifts/8445/datas.htm