Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


3-CLF Allamands


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Les Menuires
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Allamands 
Type 3-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1987 
Commissioning date ??
Date of closing down 2007
Date of pull down 2007

geometric data  
Height of valley station 2250 m
Height of mountain station 2696 m
Vertical rise 446 m
Route distance 1486 m
Horizontal length ?? m
Average incline ?? %
Largest incline 65 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1145 Pers/h
Travel time 11,27 min
Driving speed line 2,2 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 199 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Montaz Mautino
Cab model ??
Seating duckboard (plastic)
Seat heater no
Persons per cab
Number of cabs 150 Stk
Cab distance 19,8 m
Cab interval 9 s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 29/12/16 20:50:00
PHOTOS: 28/12/05 20:17:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
3178 visit(s) since 27/11/05
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 8474
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/8474/datas.htm