Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF Bettex


Mountain station
Mountain station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Les Menuires
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Bettex 
Type 2-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1988 
Commissioning date ??
Date of closing down 2015
Date of pull down 2015

geometric data  
Height of valley station 1560 m
Height of mountain station 1743 m
Vertical rise 183 m
Route distance 1030 m
Horizontal length ?? m
Average incline ?? %
Largest incline 28 %
Number of pillars 13 Stk
Greatest spanwidth 119 m
Max ground clearance 16 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1000 Pers/h
Travel time 9 min
Driving speed line 2,3 m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 30 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 613 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 147 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive mechanical

cabins data  
Grip type ??
Cab manufacturer Montaz Mautino
Cab model ??
Seating duckboard (timber)
Seat heater no
Persons per cab
Number of cabs 125 Stk
Cab distance 16,56 m
Cab interval 7,2 s

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 29/12/16 20:50:11
PHOTOS: 28/12/05 20:16:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4589 visit(s) since 27/11/05
Last visit 19/09/19

LIFT-WORLD IDs
Lift-ID: 8476
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/8476/datas.htm