Lift-Database » Lifts in the world
12-MGFJ Preyerand
Valley station
Pylone
Mountain station
General information | |
---|---|
Place | Les Menuires |
resort | Les Trois Vallées |
Region | Rhône-Alpes |
Country | |
Name of lift | Preyerand |
Type | 12-MGFJ |
Lift manufacturer | Poma |
Year of construction | 1994 |
Commissioning date | 1994 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1800 m |
Height of mountain station | 1863 m |
Vertical rise | 63 m |
Route distance | 358 m |
Horizontal length | ?? m |
Average incline | 18 % |
Largest incline | 49 % |
Number of pillars | 1 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 2,6 m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1244 Pers/h |
Travel time | ?? min |
Driving speed line | 8,0 m/s |
Speed on towers | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 132 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Sigma |
Cab model | ?? |
Seating | none |
Seat heater | no |
Heater | ?? |
Aircon | ?? |
Persons per cab | 12 |
Number of cabs | 6 Stk |
rope data | |
---|---|
Rope manufacturer | Tréfileurope |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 48 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 29/08/20
PHOTOS: ??
Lift-Statistics
14277 visit(s) since 14/11/05
Last visit 04/12/24
LIFT-WORLD IDs
Lift-ID: 8488
Place-ID: 1109
https://www.seilbahntechnik.net/en/lifts/8488/datas.htm
Datas: 29/08/20
PHOTOS: ??
Lift-Statistics
14277 visit(s) since 14/11/05
Last visit 04/12/24
LIFT-WORLD IDs
Lift-ID: 8488
Place-ID: 1109
https://www.seilbahntechnik.net/en/lifts/8488/datas.htm